Category: Industrial

  • IFB

    IFB

    PROJECT: IFB RESEARCH & DEVELOPMENT CENTRE PHASE-I & PHASE II
    LOCATION: Verna, Goa
    YEAR: Phase I (2009 – 2010), Phase- II (2014)
    BUILT-UP AREA: 5420 m2
    ARCHITECTS / PLANNERS: Roheet Hede & Associates
    PRINCIPAL CONSULTANTS: Kuvelkar Salkar Associates
    HVAC CONSULTANT: Airtron Consulting Engineers Pvt. Ltd.
    ELECTRICAL CONSULTANT: Eng. R.D. Bhide
    CONTRACTORS: Phase I – Manjeet & Co. | Phase II – R.B.S. Candiaparcar.
    Formulated for IFB, the plan entails a systematic expansion of the Research & Development facility, incorporating both destructive and non-destructive testing protocols for machinery. Emphasizing synergetic operation amongst IFB’s Sales, Production, and Research units, the facility has earned recognition from industry counterparts as a leading-edge testing facility in the country.

  • PENTAIR

    PENTAIR

    PROJECT: Pentair Water India (Office expansion block)
    LOCATION: Verna, goa
    YEAR: 2013- 2014
    BUILT-UP AREA: 647.00 m²
    STATUS: Complete
    Architects / Planners: Roheet Hede & Associates
    Principal Consultants: Kuvelkar Salkar Associates
    Electrical Consultant: Eng. R.D Bhide
    HVAC Consultant: SV Kamat and Associates
    Integral to the office expansion of a major water solutions company, this project integrates additional office cubicles with dedicated spaces for training, conferences, and meetings. Balancing functionality and aesthetic appeal, the design enhances the workspace to meet evolving business needs.

  • P&G DC

    P&G DC

    PROJECT: Procter & Gamble Distribution Centre
    LOCATION: Penjerla Village, Kothur Mandal,Hyderabad, Telangana
    YEAR: 2012 – 2013
    BUILT-UP AREA: 30,974.00 m²
    STATUS: Complete


    Tasked with designing the Main Distribution Centre for Central India’s largest production and distribution facilities, our focus extended to planning and designing utility and service units. It connects to the existing production facilities for Health & Femme Care units P&G. The project also involved creating onsite and offsite parking facilities catering to trailer and container trucks, ensuring seamless operations within the expansive facility.

    PRINCIPAL CONSULTANTS: Kuvelkar Salkar Associates
    ARCHITECTS / PLANNERS: Roheet Hede & Associates
    ELECTRICAL / HVAC CONSULTANT: Airtron Consulting Engineers Pvt. Ltd.
    FIRE SAFETY CONSULTANT: D.K. Engineers
    CONTRACTORS (PEB): Tata BlueScope Steel Ltd.

  • SIEMENS

    SIEMENS

    PROJECT: Siemens Energy Automation Plant & Office Block Ltd.
    LOCATION: Verna Industrial Estate, Goa
    YEAR: 2010 – 2012
    BUILT-UP AREA: 6480.00 m2
    STATUS: Complete
    Architects / Planners: Roheet Hede & Associates
    Principal Consultants: Kuvelkar Salkar Associates
    HVAC Consultant: S.V. Kamat& Associates
    Electrical Consultant: Eng. R.D. Bhide
    Fire Safety Consultant: Prakash Kapade (SSIES)
    Architectural Design and Planning for Siemens in Goa involved a 2-storey office block, Production, and Testing area with ancillary Employee facilities. The 1900m2 office block included Employee Dining, change rooms, security check facilities, and space for about 300 workstations, etc., along with a 4580m2 PEB structured Production plant.

  • SYNGENTA T&P BLOCK

    SYNGENTA T&P BLOCK

    PROJECT: Syngenta, Technology and Project Block
    LOCATION: Corlim, Goa
    YEAR: 2007- 2008
    BUILT-UP AREA: 5,521.00 m²
    STATUS: Complete
    Architects / Planners: Roheet Hede & Associates
    Principal Consultants: Kuvelkar Salkar Associates
    Electrical / HVAC Consultant: Airtron Consulting Engineers Pvt. Ltd.
    Designed for Syngenta, the Technology and Project Block design focused on segregating Laboratories and their service areas to eliminate physical connections between Scientists and Service engineering staff. Achieved through a box-in-a-box concept, the service floor is sandwiched between two laboratory floors, with a service corridor enveloping the structure, optimizing functionality for both teams.

  • WALKE CHEMICALS

    WALKE CHEMICALS

    PROJECT: Walke Chemicals
    LOCATION: Mapusa Industrial Estate, Goa
    YEAR: (FILL)
    BUILT-UP AREA: (FILL)
    Situated on a compact plot in an industrial zone, the design of this structure prioritized efficiency in space utilization. It takes the form of a four-story box with a prominent rectangular staircase block on one side. To elevate its visual appeal, vibrant colors grace the window bands, and dynamic horizontal slats at the roof eaves level were introduced, adding a touch of modern flair to the overall design.